Operations update · 10:24
Failure on the North aggregation link
The North → core A segment is unavailable. Traffic reaches core B through the remaining path.
Service restored. Redundancy degraded.
The incident remains open until repair is complete and the return to the normal architecture is validated.
- Observed impact
- The failure interrupted the direct path from the North PoP to core A. After rerouting, all six service probes respond; the North → East segment carries 68 Gbit/s out of 100 Gbit/s.
- Actions taken
- The NOC confirmed traffic rerouting, checked services and passed the information needed for repair to the transport maintenance provider.
- Validation obtained
- Service has been verified within the scope of the probes. The backup path is carrying traffic; this check closes neither the repair nor the capacity follow-up.
Who does what?
- The NOC coordinates.It tracks service, the load on the remaining path and progress on the intervention.
- The transport maintenance provider repairs.It locates the fault, carries out the repair and provides its test measurements.
- The network operator validates the return to normal.It authorises recommissioning and verifies resilience before closure.
The three stages illustrated
- 09:41 · detect and assess.Loss of the North → core A segment; correlate the alarm with the affected path.
- 10:24 · verify service.Traffic rerouted, service probes passing, capacity still monitored. Redundancy remains degraded.
- After repair · accept and close.Segment checks, authorised return to normal and final report.